I-65 through Franklin and I-840 lose lanes 8 p.m. to 5 a.m. nightly through Nov. 21 for TDOT resurfacing. Plus daytime state route work and who to call.

Last checked 2026-11-15. This page is updated weekly. Lane closures come from TDOT’s Region 3 lane closure report for Nov. 15-21 and its Oct. 29 release on I-840. TDOT had not posted its report for Nov. 22-28 when we checked; it has posted each week’s report on the Thursday before. City projects come from Franklin’s East McEwen Drive Phase 4 page, updated Nov. 14, and its Capital Improvement Projects pages. We found no city road closure notices in the city’s digital newsroom on Nov. 15.

Two road agencies work in Franklin. The Tennessee Department of Transportation (TDOT) runs the interstates and numbered state routes, including I-65, I-840, Highway 96 and Columbia Avenue (U.S. 31). The City of Franklin builds and maintains city streets and runs a long list of widening projects through its 10-year Capital Investment Program.

Who to call

  • Live traffic, cameras and closures: TDOT SmartWay, or dial 511
  • City street problems, right-of-way permits: Franklin Streets Department, 615-791-3254
  • City road projects: Engineering Department, 615-791-3218
  • Report a traffic signal or streetlight problem: city signal form or streetlight form
  • Emergencies and crashes: 911

This week on the interstates and state routes

TDOT’s lane closure report for Sunday, Nov. 15, through Saturday, Nov. 21, lists this work in Williamson County. Contractors supply the schedule, and most work depends on the weather. TDOT gave no detours and asked drivers to allow extra time.

Road Where When What
I-65, both directions Mile markers 60 to 66, through Franklin 8 p.m. to 5 a.m. nightly, Nov. 15-21 Multiple lanes closed for resurfacing
I-65, both directions Mile markers 71 to 74, Concord Road to Old Hickory Boulevard 8 p.m. to 5 a.m. nightly, Nov. 15-21 Multiple lanes closed for resurfacing
I-840, both directions Mile markers 28 to 37 8 p.m. to 5 a.m. nightly, Nov. 15-21 Multiple lanes closed for resurfacing
I-840, both directions Mile markers 38 to 45 8 p.m. to 5 a.m. Tuesday and Wednesday nights, Nov. 17-18 One lane at a time closed by a moving crew for lens replacement
I-840, both directions Mile markers 45 to 52 8 p.m. to 5 a.m. Wednesday night, Nov. 18 One lane at a time closed by a moving crew for lens replacement
U.S. 31 (SR-6) Log miles 11.2 to 11.9 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Flagging for an overhead electrical upgrade
U.S. 31 (SR-6) Log miles 0 to 5 8 p.m. to 5 a.m. Tuesday night, Nov. 17 One lane at a time closed by a moving crew for lens replacement
Highway 96 (SR-96) Log miles 11.6 to 11.9, at Ralston Lane 8 p.m. to 5 a.m. Sunday night, Nov. 15, then eastbound 9 a.m. to 3 p.m., Tuesday to Friday, Nov. 17-20 Lane shift for a turn lane improvement (not a TDOT project)
Highway 96 (SR-96) Log mile 13.3 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Single lane closed for underground boring
SR-106, southbound Log mile 14 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Lane shift to relocate a gas line
Moores Lane (SR-441) Log mile 1.7 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Single lane closed for underground boring
Concord Road (SR-253) Log miles 4.2 to 4.9 Around the clock, Nov. 16-20 Shoulder closed for a water line installation
Concord Road (SR-253) Log mile 0.9 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Single lane closed for underground boring
Concord Road (SR-253) Log miles 1.7 to 7.1 8 p.m. to 5 a.m. Tuesday night, Nov. 17 One lane at a time closed by a moving crew for lens replacement
Nolensville Road (SR-11) Log miles 13.3 to 13.6 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Single lane closed for the York Road widening project
SR-46 Log miles 19.3 to 24.8 8 p.m. to 5 a.m. Tuesday night, Nov. 17 One lane at a time closed by a moving crew for lens replacement
SR-100 Log miles 3 to 5.5 9 a.m. to 3 p.m. weekdays, Nov. 16-20 Flagging for a sidewalk project

Dropped since last week’s report: the eastbound Highway 96 widening flagging at log miles 1.1 to 3.5, the Nolensville Road signal work at log mile 14 and the I-840 bridge inspections. None of them is on the Nov. 15-21 report.

TDOT expects to finish the I-840 resurfacing, from near SR-6 to east of Arno Road, by the end of November 2026, according to its Oct. 29 release. It asked drivers to slow down and move over for crews. Report potholes on state routes to the TDOTFIX hotline, 833-TDOTFIX; TDOT’s Nashville office is 615-741-2848.

The I-65 work at mile markers 71 to 74 is part of a resurfacing contract that started Oct. 11 from south of Concord Road to the Davidson County line, toward Brentwood, about seven miles north. It brings nightly lane closures from 8 p.m. to 5 a.m. and some ramp closures, and TDOT expects to finish it by Dec. 31, 2026, according to its Oct. 9 announcement.

Before you drive: check SmartWay for live cameras and incidents, or call 511.

City projects under construction

East McEwen Drive Phase 4. The city is rebuilding and widening East McEwen Drive from about 800 feet east of the roundabout at Cool Springs Boulevard and Oxford Glen Drive to Wilson Pike (SR-252). It will be a four-lane divided road with turn lanes, curb and gutter, a sidewalk, a multi-use path and streetlights. Construction started April 28, 2025, and the city estimates completion in 2028. The approved budget is $56.1 million, including up to $30.24 million in federal grant money, according to the project page, updated Nov. 14. Project contact: David Hodnett, 615-791-3218.

City projects in design

These are on the city’s dashboard and Capital Investment Program list but not yet under construction:

  • Columbia Avenue widening (U.S. 31): a five-lane road with medians in places, to carry traffic to and from downtown. The city is buying land for it now. The estimate rose from $38 million to $51.5 million in a TDOT agreement amendment that aldermen approved Nov. 10, with a new completion deadline of Dec. 31, 2031 (our story).
  • Liberty Pike, Mallory Lane and North Royal Oaks Boulevard intersections: rebuilt intersections the city says are needed before traffic from Mallory Lane and Carothers Parkway development overwhelms them. The project is in design, with completion estimated in 2029. Estimate: $21 million.
  • Old Peytonsville Road and Long Lane bridge: a new crossing over I-65 in the Goose Creek area, on bridge piers TDOT built in 2016, so drivers can cross the interstate without using the Goose Creek Bypass or Highway 96. The project is in design, with completion estimated in 2030. Estimate: $28.2 million.
  • Church Street improvements and streetscape: new water, sewer and storm drain lines, power lines moved underground, new sidewalks and street lighting. The city is buying the land it needs now, with completion estimated in 2031. Estimate: $16.1 million.
  • East McEwen Drive Phase 5: an extension from Wilson Pike to Longmore Lane in Brentwood, built with the City of Brentwood.
  • Peytonsville Road and Pratt Lane: Peytonsville Road rebuilt as a four-lane divided street at Pratt Lane.
  • Lewisburg Avenue sidewalks: sidewalks on both sides from west of Stewart Street, with a future trail to Mack Hatcher Parkway.
  • Main Street sidewalk repair: replacing the faded, uneven brick pavers and crosswalks downtown to meet accessibility standards.

Recently finished

  • New Highway 96 West multi-use trail, from Vera Valley Drive to Fifth Avenue North, linking Westhaven to downtown.
  • Jordan Road rebuilt from Aspen Grove Drive to near Mallory Lane, finished in December 2024.

Related guides: getting around Franklin, building permits and zoning and who to call at City Hall.

Frequently asked questions

Is there construction on I-65 in Franklin?

Yes. TDOT is resurfacing I-65 between mile markers 60 and 66, with lane closures in both directions from 8 p.m. to 5 a.m. nightly, Sunday, Nov. 15, through Saturday, Nov. 21, 2026. North of Franklin, mile markers 71 to 74 close lanes on the same nights.

When will the East McEwen Drive widening be finished?

The city’s project page puts completion of East McEwen Drive Phase 4, from Cool Springs Boulevard to Wilson Pike, in 2028.

How do I check traffic and road closures in Tennessee?

Use TDOT SmartWay at smartway.tn.gov, or dial 511 from any phone.

Who do I call about a pothole or street problem in Franklin?

Call the City of Franklin Streets Department at 615-791-3254. State routes are maintained by TDOT.